Lets be realistic here. 1K for something without CMS should be well than enough. It can not take you more than 2-5 days to get something like that together.
Quote:
|
Originally Posted by RedCardinal Let's call a spade a spade - the above is often going to be 2 templates (homepage and content page) and I think the last 2 points in the spec are extraneous. |
He's right, 2 templates to be done, and once the customer is happy with that the rest is flower on your ears.